The Kings Herald

Independent Sacramento Kings Coverage. By Fans, For Fans. | Support Us On Patreon

Golden 1 Center construction update

By | 0 Comments | Aug 16, 2018

The Golden 1 Center is now more than a year into its construction process and with each passing day, a new feature of the downtown arena pops up. These days, the roof trusses and the exterior façade metal panel and glazing at the south side of the practice facility are the new noticeably visible features on the exterior of the building.

This video we shot Wednesday shows how the arena is shaping up. At the 7-second mark you will see what's left of the Downtown Plaza bridge after it was gutted. At the 25-second mark is the main entrance of the arena where the five-story, glass hangar doors will be. Beyond that, the roof trusses are visible. The K Street entrance is at the 41-second mark and the exterior of the practice facility is shown at 46 seconds.

For a comparison, take a look at this video from some of the same spots two months ago.

In other arena news, the folks behind the final remaining challenge to the arena's financing plan, which was rejected by a judge last month, have officially thrown in the legal towel, according to Dale Kasler of The Sacramento Bee.

Green lights all around as fall 2016 inches closer.

Patreon Membership
* indicates required


To prevent spam, our system flags comments that include too many hyperlinks. If you would like to share a comment with multiple links, make sure you email editorial@kingsherald.com for it to be approved.

0 Comments

Badge Legend

Patreon Supporter Patreon Supporter   Registered On Day 1 Registered On Day 1   Published Post Published Post  Published Post Nostradumbass
Comment Up Votes 200 Up Votes   Comment Up Votes 500 Up Votes    1,000 Up Votes    3,000+ Up Votes

Comments 50 Comments   Comments 100 Comments    250 Comments    500 Comments    1000+ Comments